top of page
callaway logo-small.webp

(713) 240-7564

How to Open a Childcare Center in Florida: What You Need to Know Before You Build

  • Callaway Childcare Construction
  • Jul 7
  • 5 min read
Inside a colorful childcare centre.

If you’re exploring how to open a childcare center in Florida, you likely have a bold vision and a thousand questions. Maybe you’re driven by a passion for early education or see a growing need in your community. 


Whatever your ‘why,’ understanding the state’s licensing requirements is the first step in bringing your dream center to life. Every detail, from square footage to staff credentials, must meet Florida’s standards.


This guide by Callaway Childcare Construction breaks it all down clearly, practically, and without the technical jargon so you can build a legally and structurally sound childcare center that’s ready to serve from day one.


Breaking Down Florida Childcare Licensing Requirements

If you want to open a childcare center in Florida, you need to design with regulations in mind. Skip the fine details, and you don’t just risk delays, but your whole launch.

First up: childcare licensing. 


How Do I Get a Childcare License in Florida?

In Florida, the Department of Children and Families (DCF) oversee childcare licensing.

They have a clear step-by-step guide that goes over how to get started, what forms to submit, inspections to pass, and other details.


Heads up: their documentation might feel a little dense at first, but it’s full of answers that will save you time and money down the line.


Here are the three key resources to keep close:


Core Licensing Requirements for Opening a Childcare Center in Florida

You don’t need a legal degree to get this right. But you do need to know what’s non-negotiable.


These are the basics DCF will check and what your building must support:

  • Indoor space: At least 35 sq ft per child.

  • Outdoor space: At least 75 sq ft per child, fenced.

  • Toilets & sinks: Specific counts based on age and number of children.

  • Staffing: Background checks, training, and CPR certification.

  • Director: A credentialed lead with the right experience.

  • Ratios: From 1:4 for infants to 1:25 for older kids.

  • Safety: Emergency exits, sanitation, food policies, and more.

  • Accessibility: ADA compliance from restrooms to ramps.


It’s a long list, but that’s the point. Licensing requirements help keep kids safe and ensure that centers meet the needs of both families and children.


Ratios Shape Your Floor Plan

Florida has firm staff-to-child ratios based on age groups.

These ratios matter. Your staffing and space dictate the number of children you can serve, so you must build with that in mind. 


Here’s what Florida requires:

  • Infants (under 12 months): 1 adult per 4 children

  • 1-year-olds: 1 per 6

  • 2-year-olds: 1 per 11

  • 3-year-olds: 1 per 15

  • 4-year-olds: 1 per 20

  • 5 years and up: 1 per 25


In short, more kids require more space,  staff, and infrastructure. 


The Director and Staff Qualifications You Need to Open a Childcare Center in Florida

To open a childcare center in Florida, one of the most important steps is hiring the right people. In particular, a qualified director.


The good news? You don’t need to have a degree in early childhood education to open a center. But you do need someone with the proper training and credentials to lead.


Director Requirements

Every center must have one person on file with DCF as the designated director. They are the heart of operations and the primary point of contact during inspections.


To qualify, your director must:

  • Be at least 21 years old.

  • Complete a DCF-approved Director Credential program.

  • Have experience in early childhood education or administration.

  • Pass a Level 2 background screening.


If you’re planning to open but not be present daily, you’ll still need to hire or assign someone qualified to fill this role.


Staff Requirements

Florida has clear expectations, and every person who works directly with kids must meet them.

Staff must:


These qualifications protect your license and reputation. 


How to Open a Childcare Center in Florida: Zoning & Site Planning Essentials

Choosing your location is an exciting part of the journey. It’s also where planning makes the biggest difference.


Zoning laws determine property use, and in Florida, those rules vary by city and sometimes by neighborhood. In other words, a charming space might look perfect, but without the right zoning, it could add unexpected time and cost to your project.


The key is to check early, before you commit. A feasibility review can save you months down the line and keep your project moving smoothly.


Here’s what to confirm before signing a lease or making a purchase:

  • Zoning designation: Is childcare permitted outright? Or do you need a special exception?

  • Playground setbacks and fencing: Some municipalities require buffers, specific surfacing, or certain types of fencing.

  • Parking and traffic flow: Drop-off lanes, required spaces, and safe circulation are often regulated.

  • Noise rules: Local ordinances may limit outdoor play hours, especially near residential zones.

  • ADA access: Your entryways, bathrooms, and play areas must be accessible from the jump and not retrofitted later.


Sort out the details early so your site sets you up for success, not setbacks.


Environmental Health & Safety Rules for Opening a Childcare Center in Florida

You might have the square footage. The ratios. The right number of sinks. But there’s a second layer of requirements that catches a lot of builders off guard, and delays more openings than you’d think.


This is where the health department, fire marshal, and ADA inspectors come into play. Their rules aren’t always listed in the DCF handbook, but they are absolutely enforced.


Radon Testing

Every childcare center must conduct radon testing within the first year of opening, regardless of location or building age. If levels exceed 4.0 pCi/L, you’ll need mitigation before you can proceed.


ADA Compliance

Accessibility isn’t just about ramps. It’s about:

  • Door widths

  • Circulation space between rooms

  • Restroom layout

  • Outdoor play surfaces

  • Entry points


Trust us: designing for ADA early on is much easier, cheaper, and smarter than retrofitting after inspection fails.


Fire Code Requirements

Sprinklers and alarms are just the beginning. You’ll also need:

  • Smoke detectors in every room

  • Clearly marked and unobstructed emergency exits

  • Emergency lighting

  • Backup power in larger centers


Fire marshals will inspect everything before you open, and we ensure they find nothing to flag.


Build Your Licensed Childcare Center in Florida with Confidence

If you’ve read this far, you’re not just planning to open a childcare center. You’re laying the groundwork for something that will shape families, futures, and communities for years to come.


We understand that the process of opening a childcare center in Florida can be overwhelming. But getting it right from the start means fewer headaches and more time spent doing what you set out to do: supporting kids and families. 


And you don’t have to navigate it alone.


At Callaway Childcare Construction, we work with builders, educators, and founders to transform your ideas into safe, lasting childcare spaces. Whether you're just starting to explore how to open a childcare center in Florida or already working on site plans and permits, we’re here to help.


Got questions or not sure if your site will work? Let’s talk. We’ll help you sort it all out. Connect with Callaway

 
 
 

Comments


bottom of page